2014 Line Work & Planned Service Changes

7 Weekend Work
Ninth Weekend Completed
Check markWhat we accomplished
     July 19 - 21
 

Check mark Performed completion work for tunnel lighting and receptacles in the vicinity of Times Sq-42 St
Check mark
Completed additional work and installation of components on 39 recently installed track panels
Check mark Performed structural steel repair at Queensboro Plaza
Check mark Terminated cables in signal equipment boxes
Check mark Installed new CBTC equipment in the Steinway Tubes
Check mark Chopped and patched niches for future signal equipment installation
Check mark Inspected track south of Queensboro Plaza
Check mark Replaced a 39-foot section of contact rail
Check mark Replaced 593 feet of old track tie plates
Check mark Installed 64 new tie blocks and 11 new long ties
Check mark Performed maintenance and inspection of signal equipment from Queensboro Plaza to Times Sq-42 St.
Check mark Completed installation of 510 feet of new eight-inch discharge line, including section along a 20-foot ceiling
Check mark Installed 500 feet of new polyurethane-coated steel conduits
Check mark Pulled 2,868 feet of 36-strand fiber optic cable and 75-pair telephone cable
Check mark Installed four new duct bank ladders

•  September 20 - 22: Next round of work

2014 7 line icon Line Weekend Work

In 2014, MTA New York City Transit is moving forward with three major capital improvement projects on the 7 line iconLine in Queens: installing a new Communications-Based Train Control (CBTC) signal system; track replacement and infrastructure work; and Sandy Recovery & Resiliency work reconstructing, replacing, and rehabilitating components inside the Steinway Tubes.
When these projects are completed, customers will benefit from improved service reliability, safety, and more dependable subway service along the 9.4-mile, 21-station line connecting Downtown Flushing, Queens, with Midtown Manhattan.

Get more information about our work on the 7 line icon Line, plus the full calendar of service changes, here.

Accomplishments

March 8 - 10, 2014

March 15 - 17, 2014

March 22 - 24, 2014

March 29 - 31, 2014

April 12 - 14, 2014

May 31 - June 2, 2014

June 7 - 8, 2014

June 21 - 23, 2014

June 28 - 29, 2014

 