Brief Descriptions of Work to be Advertised

** Partially Funded by Federal grant(s)


New York City Transit
Brief Description of Work
DEC 2018

B62041
SANDY MITIGATION: ZEREGA CENTRAL MAINTENANCE FACILITY [SBFP]**
$5M - $10M

This project will provide flood protection to the Zerega Central Maintenance Facility in the Bronx. Work will include:

Duration of Contract 17 Months


C40515
NEW BUS PARKING AT TULLY SITE
$10M - $50M

This project will convert a portion of two (2) lots into an interim bus parking lot near the Casey Stengel Bus Depot in Queens. Work will include:

Duration of Contract 11 Months


E34033 / E34025
REPLACE 3 HYDRAULIC ELEVATORS: GRAND CENTRAL - 42ND ST / FLUSHING & LEXINGTON LINES**
$5M - $10M

This project will replace three (3) hydraulic elevators at Grand Central - 42nd Street Station on the Flushing Line and the Lexington Avenue Line. Work will include:

Duration of Contract 33 Months


New York City Transit
Brief Description of Work
JAN 2019

A37301
STATION LIGHTING: 8 LOCATIONS / VARIOUS (2018)**
$5M - $10M

This project will improve lighting levels and utilize state of the art fixtures at 8 locations. Work will include:

Duration of Contract 12 Months


A37302
STATION LIGHTING: 3 LOCATIONS / 8AV, WPR (2019) [SBMP TIER2]**
$1M - $5M

This Small Business Mentoring project will improve lighting levels and utilize state of the art fixtures at 3 Stations on the White Plains Road and 8th Avenue Lines. Work will include:

Duration of Contract 12 Months


C34841
DCE SHOP COMPONENTS, PHASE 4: 207 ST, ADMIN
$10M - $50M

This project provides for component repairs to the inside of the 207th Street Administration Building in Manhattan. Work will include:

Duration of Contract 23 Months


C40257
EAST NEW YORK DEPOT WINDOWS AND FACADE
$5M - $10M

Window replacement and facade repairs at East New York Bus Depot. Work will include:

Duration of Contract 24 Months


C40269
ARTIC MODIFICATION: EAST NEW YORK DEPOT**
$5M - $10M

The purpose of this project is to rehabilitate interior depot spaces on the 1st Floor of the East New York Bus Depot in Brooklyn to accommodate operation and parking of new articulated buses. Work will include:

Duration of Contract 16 Months


C40270
MODULAR OFFICE: EAST NEW YORK DEPOT [SBFP]**
$1M - $5M

This project shall provide for the construction of a 4,100 sq.ft., one-story administrative building at the East New York Bus Depot on the 1st floor, inside the Depot on the Jamaica Avenue side.

Duration of Contract 12 Months


E31685
SANDY MITIGATION: 14 FAN PLANTS, LT - 1 LOC, FP 7204**
$5M - $10M

This project will provide long term coastal storm flood protection for the 50th Avenue Fan Plant in Queens. Work will include:

Duration of Contract 18 Months


P36703
SUBSTATION ROOF & ENCLOSURE: WASHINGTON HTS / 8 AV [SBMP2]**
$1M - $5M

This Small Business Mentoring project will rehabilitate the roof and enclosure at the Washington Heights Substation in Manhattan. Work will include:

Duration of Contract 20 Months


New York City Transit
Brief Description of Work
FEB 2019

A36988
PLATFORM COMPONENTS: 2 LOCATIONS / JEROME
$5M - $10M

This project will repair platforms at 2 Jerome Line Stations in the Bronx. Work will include:

Duration of Contract 16 Months


A37311
MEZZANINE COMPONENTS: NEVINS STREET / EPK [SBMP]
$500K - $1M

This project will eliminate deficient conditions rated 3.5 or worse at Nevins Street station on the Eastern Parkway Line in Brooklyn, as rated by the "Station Condition Survey'' and existing field conditions. Work will include:

Duration of Contract Months


C40273
NEW ROOF AT QUEENS VILLAGE DEPOT**
$5M - $10M

The purpose of this project is the removal of existing roofing systems and replacement with new EPDM system. Work will include:

Duration of Contract 17 Months


C40516
JAMAICA DEPOT: DEMOLITION AT LOTS #68, #72 [SBMP]
$500K - $1M

This Small Business Mentoring project will demolish the existing building structures on the Merrick Blvd. properties to allow the site to be used as a temporary parking lot prior to the construction of a new Jamaica Bus Depot. Work will include:

Duration of Contract 9 Months


E31384
REPLACE 2 BUS WASHERS: JACKIE GLEASON DEPOT [SBMP TIER2]
$1M - $5M

This Small Business Mentoring project will replace two (2) existing bus washers that are beyond their useful life and are in poor condition at Jackie Gleason Depot in Brooklyn. Work will include:

Duration of Contract 12 Months


E34028
REPLACE 8 TRACTION ELEVATORS / VARIOUS**
$10M - $50M

This project will replace eight (8) traction elevators at various locations in Brooklyn and Manhattan. Work will include:

Duration of Contract 38 Months


P36483
RECONSTRUCTION OF CBH # 392 - FLUSHING RIVER BRIDGE
$1M - $5M

This project will reconstruct circuit breaker house #392 on the Flushing Line to boost needed voltage for better movement of trains. Work will include:

Duration of Contract 24 Months


New York City Transit
Brief Description of Work
MAR 2019

A36164
ADA: 68 ST-HUNTER COLLEGE / LEXINGTON**
OVER $50M

This project will provide full ADA (Americans with Disabilities Act) accessibility at the 68th Street-Hunter College Station located in the borough of Manhattan. Work will include:

Duration of Contract 40 Months


A36949
AQUEDUCT-NORTH CONDUIT AV / RKY
$1M - $5M

This project will repair or replace station components at Aqueduct-North Conduit Avenue Station on the Rockaway Line in Queens. Work will include:

Duration of Contract 10 Months


A36986
PLATFORM COMPONENTS: 4 LOCATIONS / QUEENS BOULEVARD, ARCHER
$10M - $50M

This project will replace rubbing board and platform edges on four stations on the Queens Boulevard and Archer Lines in Queens. Work will include:

Duration of Contract 26 Months


A37300
STATION LIGHTING: 5 LOCATIONS / VARIOUS (2015) [SBMP TIER2]
$1M - $5M

This Small Business Mentoring Project will upgrade station lighting at various locations in Brooklyn and Manhattan. Work will include:

Duration of Contract 12 Months


A37307
SUBWAY INTERIOR STAIRS: 2 LOCATIONS / 8AV, BW7 [SBMP]
$5M - $10M

This Small Business Mentoring project will replace interior stairs at two locations on the Broadway-7th Avenue and 8th Avenue Lines. Work will include:

Duration of Contract 21 Months


E34026
REPLACE 11 HYDRAULIC ELEVATORS / VARIOUS**
$10M - $50M

This project will replace 11 hydraulic elevators at various stations in Manhattan, Brooklyn and Queens. Work will include:

Duration of Contract 30 Months


E34031 / E34030
REPLACE 4 HYDRAULIC ELEVATORS: FRANKLIN AVENUE / SHUTTLE & BORO HALL / CLARK STREET**
$10M - $50M

This project will replace 2 hydraulic elevators at Franklin Avenue on the Franklin Avenue Shuttle and 2 hydraulic elevators at Boro Hall on the Clark Street Line. Work will include:

Duration of Contract 27 Months


R34253
PURCHASE OF 12 3-TON CRANE CARS
$10M - $50M

This project will provide for the design, purchase, acceptance and warranty of twelve (12) 3-Ton Crane Cars.

Duration of Contract 21 Months


S33933
CODE CABLE REPLACEMENT / BW7**
$5M - $10M

This project will replace the existing code cables on the 7th Avenue Line in Manhattan with new armored fiber optic cables on existing messenger system and provide the necessary equipment to enhance system reliability. Work will include:

Duration of Contract 35 Months


New York City Transit
Brief Description of Work
APR 2019

A37250
SIR STATION COMPONENT PROGRAM
$5M - $10M

This project will repair select, identified structural and architectural defects within the station limits along Staten Island Railway. Work will include:

Duration of Contract 36 Months


A37308
SUBWAY INTERIOR STAIRS: WEST 4TH STREET / 8AV [SBMP]
$1M - $5M

This Small Business Mentoring project will replace interior stairs at West 4th Street on the 8th Avenue Line in Manhattan. Work will include:

Duration of Contract 9 Months


A37314
MEZZANINE COLUMNS: ATLANTIC AVENUE / CANARSIE [SBMP TIER2]
$1M - $5M

This Small Business Mentoring Project will eliminate deficient conditions rated 3.5 or worse at Atlantic Avenue station on the Canarsie Line in Brooklyn, as rated by the "Station Condition Survey'' and existing field conditions. Work will include:

Duration of Contract 9 Months


A46024
WATER REMEDIATION - RENEWAL: BOROUGH HALL / LEXINGTON
$10M - $50M

This project will eliminate deficient conditions rated 3.0 or worse at Boro Hall station on the Lexington Line in Brooklyn, as rated by "Station Condition Survey" and existing field conditions. Work will include:

Duration of Contract 10 Months


C40237
ROOF: FRESH POND DEPOT
$1M - $5M

This project will provide for the replacement of the existing roof and roof decking area at the Fresh Pond Bus Depot. Work will include:

Duration of Contract 19 Months


C48720
VENTS BETWEEN STATIONS / E 192 ST-E 198 ST /BXC [SBMP TIER2]
$1M - $5M

This Small Business Mentoring project will replace deteriorated sidewalk vent gratings, frames and the underside of the vent structures between E 192 St-E 198 S on the Grand Concourse Line. Work will include:

Duration of Contract Months


C48721
VENTS BETWEEN STATIONS: E 198 ST-E 205 ST / BXC [SBMP TIER2]
$1M - $5M

This Small Business Mentoring project will replace deteriorated sidewalk vent gratings, frames and the underside of the vent structures between E 198 St-E 205 St on the Grand Concourse Line. Work will include:

Duration of Contract Months


P36708
NEW SUBSTATION: CANAL STREET / 8TH AVENUE
$10M - $50M

This project will construct a new power substation in the vicinity of Canal Street/8th Avenue to serve the IND, 8th Avenue Line. Work will include:

Duration of Contract 39 Months


New York City Transit
Brief Description of Work
MAY 2019

A37136
ADA / STATION CAPACITY ENHANCEMENTS: QUEENSBORO PLAZA / FLS
$10M - $50M

This project will provide full ADA (Americans with Disabilities Act) accessibility at the Queensboro Plaza station on the Flushing Line located in the borough of Queens. Work will include:

Duration of Contract Months


A37671
SANDY MITIGATION: 138 ST - GR CONCOURSE/JER (VENT BATTERY A)**
$1M - $5M

Rehabilitation of southern vents at 138th Street Station on the Jerome Line. In addition, Mechanical Closure Devices will be provided as part of flood mitigation. Work will include:

Duration of Contract Months


C33941
ROOF REPLACEMENT: TIFFANY CENTRAL WAREHOUSE
$10M - $50M

This project will replace the existing single ply EPDM membrane roofing system at Tiffany Street Store Room. Work will include:

Duration of Contract 24 Months


C34928
REHAB EMERGENCY EXITS - VARIOUS LOCS (3RD PARTY)**
$1M - $5M

This project will rehabilitate two emergency exits on the Lexington Line in Manhattan. Work will include:

Duration of Contract 24 Months


E30465 / E30512
REPLACE 8 ESCALATORS / VARIOUS**
$10M - $50M

This project will replace eight (8) escalators at various locations. Work will include:

Duration of Contract 48 Months


SF16-1655
PAINT BOOTH: YUKON DEPOT [SBMP TIER2]
$1M - $5M

This Small Business Mentoring project shall provide all labor, tools, equipment necessary for installing, testing, and putting into operation a new paint booth. Work will include:

Duration of Contract 8 Months


New York City Transit
Brief Description of Work
JUN 2019

A46026
STATION RENEWAL: 111 STREET / FLUSHING
$10M - $50M

Duration of Contract 23 Months


A46027
STATION RENEWAL: 103 ST-CORONA PLAZA / FLUSHING
$10M - $50M

Duration of Contract 23 Months


A46028
STATION RENEWAL: 82 STREET-JACKSON HEIGHTS / FLUSHING
$10M - $50M

Duration of Contract 23 Months


A46029
STATION RENEWAL: 69 STREET / FLUSHING
$10M - $50M

Duration of Contract 20 Months


A46031
STATION RENEWAL: 52 STREET / FLUSHING
$10M - $50M

Duration of Contract 20 Months


C34866 / C34867
UPGRADE SCADA SYSTEM (BMT) & BACK-UP POWER CONTROL CENTER (PCC)**
$10M - $50M

Duration of Contract 29 Months


C40952
FIRE ALARM SYSTEMS: 11 DOS LOCATIONS
$10M - $50M

Duration of Contract 34 Months


C48704 / C48714
LINE STRUCTURE COMPONENT REPAIR PROGRAM: THE BRONX (BXC) & E 161 ST - E 192 ST / CONCOURSE VENTS
OVER $50M

Duration of Contract 49 Months


C48730
REPAIRING 'A' AND PRIORITY 'B' COLUMN BASE CONDITIONS / WPR
$10M - $50M

Duration of Contract 24 Months


E30436
REPLACE 7 ESCALATORS / VARIOUS (BRONX & MANHATTAN)**
$10M - $50M

Duration of Contract 36 Months


P36341
SANDY RESILIENCY: SITE IMPROVEMENTS AT 2 LOCATIONS (SBFP)**
$1M - $5M

Duration of Contract 8 Months


S33931
LIFE CYCLE REPLACEMENT OF SPEED ENFORCEMENT SYSTEMS**
$10M - $50M

Duration of Contract 48 Months


S33932
LIFE CYCLE REPLACEMENT OF CODE SYSTEMS - PHASE 1**
$10M - $50M

Duration of Contract 36 Months


New York City Transit
Brief Description of Work
JUL 2019

C34846
DCE SHOP COMPONENTS - PHASE 3 / JEROME [SBMP TIER2]
$1M - $5M

Duration of Contract 10 Months


C48703
LINE STRUCTURE COMPONENT REPAIR PROGRAM: BROOKLYN (EPK)**
$10M - $50M

Duration of Contract 26 Months


E31713
REHAB FAN PLANT DAMPER SYSTEM - VARIOUS LOCATIONS**
$10M - $50M

Duration of Contract 36 Months


P36705
CENTRAL SUBSTATION RENEWAL INCLUDING NEW RECTIFIER / 6AV**
$10M - $50M

Duration of Contract 31 Months


P36706
RECONSTRUCT 6 NEGATIVE MANHOLES - CENTRAL SUBSTATION / 6AV**
$500K - $1M

Duration of Contract 36 Months


New York City Transit
Brief Description of Work
AUG 2019

C32452
NEW 84C CONTACT RAIL ON LEXINGTON AVE LINE
OVER $50M

Duration of Contract Months


C34915
OVERCOATING: PORTAL - KING'S HWY / CULVER
$10M - $50M

Duration of Contract 38 Months


C34925
OVERCOATING: MYRTLE AVENUE - DESALES PLACE / JAMAICA
$10M - $50M

Duration of Contract 33 Months


C43051
COMM ROOM UPGRADE AND EXPANSION [SBDP]
$10M - $50M

Duration of Contract Months


C43752
RTO FAC: CHAMBERS ST / NASSAU LOOP
$1M - $5M

Duration of Contract 23 Months


P36489
NEW NEGATIVE SIDE FEEDERS ON LEXINGTON AVE LINE
OVER $50M

Duration of Contract Months


New York City Transit
Brief Description of Work
SEP 2019

A35304 / A37135
ADA & STATION RENEWAL: WOODHAVEN BOULEVARD / JAMAICA**
$10M - $50M

Duration of Contract 36 Months


A35307 / A35305 / A35306
STATION RENEWALS: CYPRESS HILLS, 85 STREET-FOREST PARKWAY, 75 STREET - ELDERTS LANE / JAMAICA LINE
$10M - $50M

Duration of Contract 23 Months


A37217
PLATFORM COMPONENTS: 10 LOCATIONS / BROADWAY-7TH AVENUE
$10M - $50M

Duration of Contract 22 Months


A37285
PLATFORM COMPONENTS: 4 LOCATIONS / 6AV, E63
$5M - $10M

Duration of Contract 26 Months


A37286
PLATFORM COMPONENTS: 2 LOCATIONS / QUEENS BOULEVARD
$5M - $10M

Duration of Contract 12 Months


A37287
PLATFORM EDGES: 2 LOCATIONS / QUEENS BOULEVARD
$5M - $10M

Duration of Contract 10 Months


E30525
REPLACE 5 ESCALATORS/ VARIOUS ( BROOKLYN & MANHATTAN)**
$10M - $50M

Duration of Contract 35 Months


SF02-8129
PURCHASE 45 STANDARD ELECTRIC BUSES
OVER $50M

Duration of Contract Months


ST21-6633
STATION PAINTING AT COMP LOCATION: PELHAM BAY PARK/PELHAM
$500K - $1M

Duration of Contract Months


New York City Transit
Brief Description of Work
OCT 2019

B40666
PURCHASE 275 HYBRID-ELECTRIC STANDARD BUSES
OVER $50M

Duration of Contract 21 Months


C40953 / E30526
REPLACE 3 ESCALATORS AND FIRE ALARM SYSTEM: FLUSHING- MAIN STREET / FLUSHING**
$10M - $50M

Duration of Contract 34 Months


New York City Transit
Brief Description of Work
NOV 2019

C34922
LIVONIA MAINTENANCE FACILITY REHAB/RECONSTRUCT PHASE 1**
$10M - $50M

Duration of Contract 29 Months


Long Island Rail Road
Brief Description of Work
DEC 2018

L11872
N. MAIN AND ACCABONAC BRIDGE REPLACEMENTS**
$1M - $5M

The contract requires the installation of a total of nine (9) 72” drilled shafts with 75‿ embedment at two bridges in East Hampton, NY: four (4) 72” diameter drilled shaft at North Main Street Bridge; four (4) 72” diameter drilled shaft at Accabonac Road Bridge; and one (1) 72” diameter trial drilled shaft.

Duration of Contract 5 Months


Long Island Rail Road
Brief Description of Work
JAN 2019

L11900
LYNBROOK STATION PLATFORM IMPROVEMENTS
$1M - $5M

The full rehabilitation of platform level waiting room and canopy including: windows and doors, exterior coating, interior finishes, benches, ventilation, and translucent canopy roof. In addition, the Contractor will be responsible for all Lead Base Paint at the platform level.

Duration of Contract 10 Months


Long Island Rail Road
Brief Description of Work
APR 2019

L11409
WRECK LEAD BRIDGE REHABILITATION
$250K - $500K

The scope of the work includes, at a minimum, the replacement or repair of the following mechanical elements of the bridge.

Duration of Contract 12 Months


Long Island Rail Road
Brief Description of Work
SEP 2019

E04979
LONG ISLAND CITY YARD RESILIENCY**
$10M - $50M

Duration of Contract 24 Months


Metro-North Railroad
Brief Description of Work
DEC 2018

M10667/M10769
REPAIRS FOR LOCALIZED DEFICIENCIES IN GCT TRAINSHED AND EAST SPINE VESTIBULE
$10M - $25M

This contract is part of the cyclical program to rehabilitate the Grand Central Terminal Train Shed. It will provide for priority repairs to steel, concrete and expansion joints to correct localized deficiencies. The contractor will work from street level (Park Avenue) to make repairs below grade and will also work from track level on overhead repairs during night and off peak hours. At 48th Street and Park Avenue the contractor will perform structural repairs and modifications to architectural finishes above the East Spine Vestibule, immediately east of Park Avenue.

Duration of Contract 24 Months


M10717
HARLEM LINE STATION IMPROVEMENTS
$10M - $50M

This project will replace the existing platforms at the Hartsdale and Scarsdale stations with new platforms, new platform canopies [as per the new ESI Stations Standard relating to historical stations], new stairs leading to the platforms, bring stairs to a state of good repairs leading to station overpass and existing village bridges, install 3 new elevators (two at Hartsdale and one at Scarsdale) [which will required Coned electrical service upgrade at each station] and one ramp (at Scarsdale), rebuild two ramps (one each at Scarsdale and Hartsdale), install a snow melting system for the stations platforms, ramps and stairs at both stations [which will require ConEd gas service], and install customer service information systems in accordance with Metro-North‿s CSI program.

Duration of Contract 44 Months


M11467
HARLEM RIVER LIFT BRIDGE- CONSTRUCT FENCING & ACCESS CONTROL**
$1M - $5M

This contract provides for the construction of fencing to deter and prevent unauthorized access while providing access control to MNR personnel.

Duration of Contract 13 Months


Metro-North Railroad
Brief Description of Work
JAN 2019

M11561
INSTALLATION-PORT JERVIS LINE
$5M-$10M

This includes all work installing 12 fiber optic cable in Innerduct direct buried, Trough, and in Cable Tray in different segments of Port Jervis Line from Suffern, NY to Port Jervis, NY.

Duration of Contract 6 Months


M10964/M10433/M11539
BRIDGE OVER WILLET AVENUE, BRIDGE OVER HIGHLAND STREET, RETAINING WALL IN PORT CHESTER NY**
$10M - $25M

This contract provides for the replacement of two railroad bridges and the reconstruction of a retaining wall. The two bridges are existing four track steel railroad bridges over Willet Avenue and over Highland Street on the New Haven line (Overhead Catenary wires) at Milepost NH 25.74 and NH 25.83 in Port Chester, West Chester County, New York. The Contractor will work on both bridges simultaneously and rebuild one track at a time using Accelerated Construction Methods. Work will include a full steel superstructure replacement, micropiles installation, and new concrete seat substructure. This contract will also include the replacement of the existing retaining wall in Port Chester adjacent to 149 South Main Street (NH 25.3).

Duration of Contract 24 Months


M11555
INSTALL CABLES-FORDHAM TO WOODLAWN**
$5M - $10M

Install Two Diverse Routed Fiber Optic Cables with Inner duct in Conduit, Trough, and in Cable Tray, on the Harlem Line, from Fordham Node House to Woodlawn Node House. This includes all work installing 144 fiber optic cable with inner duct in trough, FRE conduits under station platforms, figure 8 aerial ducts to the viaduct wall, cable tray over underpass bridge, track crossings and cable vaults including hardware, attachments, brackets, messenger cable, strandvise and anchors along Track 3 & 4 from Woodlawn to Fordham Node Houses.

Duration of Contract 6 Months


Metro-North Railroad
Brief Description of Work
FEB 2019

M10469
PBX SOFTWARE/HARDWARE
$1M - $5M

This contract will provide UPS (Uninterruptible Power Supply) and power distribution hardware associated with PBX (Private Branch Exchange) equipment at five (5) Metro-North Railroad locations (see below). Interface UPS to centralized reporting system. Provide software upgrade for PBX Signaling Server. Provide expansion hardware for additional users at the PBX to existing system. Locations: South East, North White Plains, Mott Haven, Croton Harmon and Poughkeepsie

Duration of Contract 18 Months


M11505
MOTOR CARS WITH TOOL CIRCUITS
$500K-$1M

This contract will provide for the purchase of four (4) Motor Cars with Tool Circuits for Metro-North Railroad's Maintenance of Way machine shop. Specifications and modifications include additional tool storage, perimeter lighting and tool circuits with retractable reels.

Duration of Contract 8 Months


M11506
DYNAMIC TRACK STABILIZER
$1M-$3M

This contract will provide for the purchase of one (1) Dynamic Track Stabilizer for Metro-North Railroad's Maintenance of Way Track and Structures Department. Specifications and modifications include modified travel cab, hose holders, reflective tape and third rail clearance.

Duration of Contract 14 Months


M11507
RAIL LIFTER
$200K-$500K

This contract will provide for the purchase of two (2) Rail Lifters for Metro-North Railroad's Maintenance of Way machine shop. Specifications and modifications include third rail clearance, LED Lighting and perimeter lighting.

Duration of Contract 7 Months


M11508
AIR COMPRESSOR (TOW BEHIND)
$100K-$300K

This contract will provide for the purchase of six (6) Air Compressors (tow behind) for Metro-North Railroad's Maintenance of Way machine shop.

Duration of Contract 4 Months


M11509
BALLAST REGULATOR
$1M-$5M

This contract will provide for the purchase of seven (7) Ballast Regulators for Metro-North Railroad's Maintenance of Way machine shop. Specifications and modifications include perimeter lighting, dust control system, third rail clearance, LED lighting and reflective tape.

Duration of Contract 12 Months


M11510
SPEED SWING
$800K-$1.5M

This contract will provide for the purchase of two (2) Speed Swings for Metro-North Railroad's Maintenance of Way machine shop. Specifications and modifications include third rail clearance, high rail equipment, train coupler and air system and reflective tape.

Duration of Contract 12 Months


M11511
ALL TERRAIN HI-REACH FORKLIFT
$100K-$500K

This contract will provide for the purchase of one (1) All Terrain Hi-Reach Forklift for Metro-North Railroad's Maintenance of Way machine shop. Specifications and modifications include enclosed cab with HVAC equipment.

Duration of Contract 5 Months


M11512
UTILITY TASK VEHICLE (UTV) (4WD W/PLOW AND SANDER)
$50K-$100K

This contract will provide for the purchase of two (2) Utility Task Vehicle (UTV) (4WD w/plow and sander) for Metro-North Railroad's Maintenance of Way machine shop. Specifications and modifications include plow and sander, coated dump body, rust protection and HVAC equipment.

Duration of Contract 4 Months


M11513
ROUGH TERRAIN ARTICULATING BOOM LIFT
$100K-$300K

This contract will provide for the purchase of one (1) Rough Terrain Articulating Boom Lift for Metro-North Railroad's Maintenance of Way machine shop.

Duration of Contract 4 Months


M11514
HYDRAULIC METAL SHEAR (NWP SHOP)
$50K-$100K

This contract will provide for the purchase of one (1) Hydraulic Metal Shear for Metro-North Railroad's Maintenance of Way machine shop.

Duration of Contract 4 Months


M11515
HYDRAULIC METAL BRAKE (NWP SHOP)
$50K-$100K

This contract will provide for the purchase of one (1) Hydraulic Metal Brake for Metro-North Railroad's Maintenance of Way machine shop.

Duration of Contract 4 Months


M11516
PROGRAMMABLE METAL CUTTING TABLE (NWP SHOP)
$50K-$100K

This contract will provide for the purchase of one (1) Programmable Metal Cutting Table for Metro-North Railroad's Maintenance of Way machine shop.

Duration of Contract 6 Months


M11517
RAIL HEATER
$500K-$1M

This contract will provide for the purchase of one (1) Rail Heater for Metro-North Railroad's Maintenance of Way machine shop. Specifications and modifications include enclosed cab with HVAC equipment, perimeter lighting and reflective tape.

Duration of Contract 10 Months


M11518
WHEEL LOADER
$100K-$500K

This contract will provide for the purchase of one (1) Wheel Loader for Metro-North Railroad's Maintenance of Way machine shop. Specifications and modifications include 4 in one bucket, side dump, hydraulic quick connects for bucket change out, forks and snow pusher.

Duration of Contract 5 Months


Metro-North Railroad
Brief Description of Work
MAR 2019

M10914
HUDSON LINE & HARLEM LINE: FIRE SUPPRESSION SYSTEM
$500K -$1M

The Contractor shall provide all surveys, field measure spaces, perform calculations, design systems, materials, labor, tools, equipment and hardware to furnish and install fully functional FM-200 Fire Suppression Systems or comparable clean agent system and do a complete testing of Fire Suppression Systems inside signal equipment houses at five (5) locations (see below) on Metro-North Railroad‿s right‿of-way. The Contractor shall provide submittals for the 60% Design and 100% Design to Metro-North's engineer on all elements of the system to include but not be limited to hardware, electrical, installation, and testing. Hudson Line locations: Morris Heights, Cortland, Cold Spring Harlem Line locations: Fleetwood, Crestwood

Duration of Contract 9 Months


Metro-North Railroad
Brief Description of Work
APR 2019

M10869
HARMON TO POUGHKEEPSIE: PRE-WIRED HOUSES**
$25M-$31M

The work under this contract shall include, but not be limited to, the design and furnishing of a new wayside signal system and grade crossing warning system to replace the existing vital relay based signal system, a non-vital system and communication links, and will provide the necessary upgraded block design.

Duration of Contract 26 Months


Metro-North Railroad
Brief Description of Work
MAY 2019

M10849
CONSTRUCTION T35 & WALDORF ELEVATORS
$5M - $10M

This contract is to replace two freight elevators - the Waldorf Elevator and the T-35 Elevator ‿ which have reached the end of their useful lives. The elevators will be replaced to meet current applicable codes and requirements, including the replacement of the controllers, drive units, car enclosures and doors as well as addition of automatic recall and emergency telephone and communications. Also, the T-35 shaft will be extended down to the upper level landing of the Oyster Bar ramp in Grand Central Terminal.

Duration of Contract 17 Months


M10991
CONSTRUCTION OF NODE HOUSE ROOFS
$1M - $5M

This contract is for the survey of 36 locations for a 10‿x 20‿ communication bungalow and furnishes, deliver and install new roofing system as needed. Metro North Railroad has 36 locations spread out on all three lines (Harlem, Hudson and New Haven) that have communication bungalows that require an assessment for the replacement of their roofs. The work includes survey and assessment of the current communication houses roof condition (includes water proofing membrane). Based on the determination of the findings the existing roofs must be replaced, as needed, with new roofing systems. The work must be performed in a matter that is non disruptive to railroad operations and free of damage to equipment within the space.

Duration of Contract 13 Months


Metro-North Railroad
Brief Description of Work
JUN 2019

E05362
HUDSON LINE POWER & SIGNALS**
$10M-$15M

The contract provides for the construction of flood resiliency improvements for selected traction power DC Substations and train yard buildings located in flood prone areas along the Hudson Line. The flood resiliency improvements for DC substations include: perimeter protection, waterproofing and hardening, water level monitoring systems/alarms and water detection systems/alarms. The flood resiliency improvements also include the waterproofing and hardening of selected train yard buildings and train yard electrical equipment deemed critical for the safe operation of the railroad.

Duration of Contract 23 Months


Metro-North Railroad
Brief Description of Work
JUL 2019

M11482
PORT JERVIS STATION: HIGH-LEVEL SIDE PLATFORM & ADA RAMP
$2M-$5M

Construction of the project is for Metro-North to construct a high-level side platform in the location of the existing grade-level platform with an ADA-compliant ramp for access to the platform. The new platform will include a single car-length canopy, shelter, and CSI elements. Design of the permanent capital improvement will be coordinated with Norfolk Southern as owner of the Port Jervis Line and New Jersey Transit as operators of Port Jervis Line service.

Duration of Contract 11 Months


M11554
DESIGN/FABRICATE TRUCK TOOLING ASSEMBLY
$100K - $250K

This contract is fo rthe design and manufacture of a Truck Shop Tool Assembly to support truck maintenance activities during the Stage 2 demolition and replacement of the remainder of Building #6.

Duration of Contract 5 Months


Metro-North Railroad
Brief Description of Work
AUG 2019

M11183/M11184
UNIFIED TRASH HANDLING FACILITY
$10M-$20M

The purpose of this project is to construct a unified trash handling facility to be employed jointly by Metro-North and Long Island Railroads, in support of the future LIRR ESA Concourse. This trash handling facility will be constructed on the platform adjacent to track 115 located on the Lower Level of GCT, next to the LIRR Concourse service corridor, where Metro-North will load trash for both railroads onto railcars for transport to BN Yard and disposal. This Track 115 Trash Transfer Facility provides safe, efficient rail service to the trash facility. Trackwork and related systems improvements, which reinstate a connection of "Ladder N" to Track 115 to facilitate train movements serving the facility are incorporated into the project.

Duration of Contract 18 Months


Metro-North Railroad
Brief Description of Work
NOV 2019

M10398
REHABILITATION OF HARLEM LINE BRIDGES**
$5M - $10M

This contract provides for the replacement of two existing railroad bridges crossing over Croton River at Metro-North Railroad's Harlem Line Milepost's 61.06 and 61.36 in Patterson, Dutchess County, New York.

Duration of Contract 24 Months


Bridges and Tunnels
Brief Description of Work
DEC 2018

VN-84/VN-11
CONSTRUCTION MANAGEMENT: RECONSTRUCTION OF THE VERRAZANO-NARROWS BRIDGE APPROACH RAMPS & BROOKLYN/GOWANUS APPROACH RECONSTRUCTION
$10M - $50M

Under this Construction Management contract, the consultant will provide construction administration work for the reconstruction of a portion of the Verrazano-Narrows Bridge upper level approach ramps, as well as project VN-11: Widening of the Gowanus Expressway from 92nd Street to Fort Hamilton Parkway.

Duration of Contract 50 Months


Bridges and Tunnels
Brief Description of Work
JAN 2019

BW-07/BW-32
CONSTRUCTION MANAGEMENT: QUALITY ASSURANCE AND CM SERVICES FOR FENDER PROTECTION INSTALLATION AT THE QUEENS AND BRONX TOWERS AT THE BRONX-WHITESTONE BRIDGE
$1M - $5M

Under this Construction Management contract, the consultant will provide Quality Oversight Inspection and Construction Management Services for the BW-07/BW-32 Design-Build project, which will provide fender protection, fire standpipe, and mooring platforms at the Queens and Bronx Towers at the Bronx-Whitestone Bridge.

Duration of Contract 28 Months


HC-80/QM-36
SPECIAL SERVICES: REHABILITATION OF VENTILATION & SERVICE BUILDINGS AT THE HUGH CAREY AND QUEENS MIDTOWN TUNNELS
$1M - $5M

Under this Design Services contract, the designer will perform a feasibility study and develop a Master Plan for the Hugh L. Carey and Queens Midtown Tunnels Buildings (Ventilation, Service, Ancillary and Emergency Garage) and grounds, as well as design the selected recommendations.

Duration of Contract 30 Months


RK-20
CONSTRUCTION: MAIN CABLE INSPECTION AND REHABILITATION AT THE ROBERT F. KENNEDY BRIDGE
$5M - $10M

Under this Construction contract, the contractor will unwrap and wedge open main cables at selected panels for in-depth inspection, perform cable wire sampling and repairs, re-compact and re-wrap the main cables, and painting of the wrapping wires, as well as associated main cable band bolts tension measurements and re-tensioning at the Robert F. Kennedy Bridge.

Duration of Contract 18 Months


RK-20 & RK-19/RK-70 Phase 1A
CONSTRUCTION MANAGEMENT FOR MAIN CABLE INVESTIGATION AND STRUCTURAL REHABILITATION AT THE ROBERT F. KENNEDY BRIDGE
$5M - $10M

Under this Construction Management contract, the consultant will provide Construction Administration and Inspection Services for RK-20 Main Cables Investigation and RK-19/RK-70 Phase 1A Construction Contract for the structural rehabilitation and associated painting at the Queens Approach, Queens Viaduct, Wards Island Viaduct, Bronx Truss Span, Bronx Approach, and Harlem River Lift Span at the Robert F. Kennedy Bridge.

Duration of Contract 42 Months


RK-23C
CONSTRUCTION MANAGEMENT: QUALITY ASSURANCE AND CM SERVICES FOR THE NEW HARLEM RIVER DRIVE CONNECTOR RAMP
$5M - $10M

Under this Construction Management contract, the consultant will provide Quality Oversight Inspection and Construction Management Services for RK-23C Design-Build contract, which includes installing a new connector ramp between the Harlem River Lift Span (HRLS) of the Robert F. Kennedy Bridge and north bound Harlem River Drive (HRD).

Duration of Contract 36 Months


VN-11
CONSTRUCTION: BROOKLYN/GOWANUS APPROACH RECONSTRUCTION
$10M - $50M

Under this Construction contract, the contractor will perform widening of the Gowanus Expressway from 92nd Street to Fort Hamilton Parkway.

Duration of Contract 42 Months


Bridges and Tunnels
Brief Description of Work
FEB 2019

HH-07A/HH-30
CONSTRUCTION MANAGEMENT: MISCELLANEOUS STRUCTURAL REHABILITATION AND OVERCOAT PAINTING AT THE HENRY HUDSON BRIDGE
$1M - $5M

Under this Construction Management contract, the consultant will provide construction administration, inspection, testing, and associated services for HH-07A/HH-30 Construction project.

Duration of Contract 33 Months


RK-66
CONSTRUCTION MANAGEMENT: QUALITY OVERSIGHT INSPECTION AND CONSTRUCTION MANAGEMENT SERVICES TO ENHANCE ELECTRIC POWER RESILIENCY AT THE ROBERT F. KENNEDY BRIDGE
$1M - $5M

Under this Construction Management contract, the consultant will provide Quality Oversight Inspection and Construction Management Services for the RK-66 Design-Build project, which perform substation upgrades, replace the Robert Moses Building boilers in a new location outside the building, and install secondary feeders with an Automatic Transfer Switch at selected locations at the Robert F. Kennedy Bridge.

Duration of Contract 36 Months


TN-53
CONSTRUCTION MANAGEMENT FOR REHABILITATION OF THE APPROACH VIADUCTS AT THE THROGS NECK BRIDGE
$10M - $50M

Under this Construction Management contract, the consultant will provide construction administration, inspection, and testing associated with the structural rehabilitation of the approach viaducts at the Throgs Neck Bridge.

Duration of Contract 57 Months


TN-87
SPECIAL SERVICES: DESIGN FOR TOWER PROTECTION AT THE THROGS NECK BRIDGE
$1M - $5M

Under this Design contract, the consultant will produce a design for the upgrade/replacement of Tower protection at the Throgs Neck Bridge. In addition, the consultant will secure all necessary permits and perform all necessary coordination with the applicable permitting agencies that will need to approve this project.

Duration of Contract 48 Months


VN-84
CONSTRUCTION: RECONSTRUCTION OF THE VERRAZANO-NARROWS BRIDGE APPROACH RAMPS
OVER $50M

Under this Construction contract, the contractor will reconstruct a portion of the Verrazano-Narrows Bridge upper level approach ramps.

Duration of Contract 48 Months


Bridges and Tunnels
Brief Description of Work
MAR 2019

TN-53
CONSTRUCTION: REHABILITATION OF THE APPROACH VIADUCTS AT THE THROGS NECK BRIDGE
OVER $50M

Under this Construction contract, the contractor will perform structural repairs of the approach viaducts at the Throgs Neck Bridge.

Duration of Contract 48 Months


VN-80
SPECIAL SERVICES: DESIGN FOR THE REHABILITATION OF THE SUSPENDED SPAN LOWER LEVEL DECK AT THE VERRAZANO-NARROWS BRIDGE
$1M - $5M

Under this Design contract, the consultant will produce a design for the rehabilitation of the suspended span lower level deck to extend the life of the deck.

Duration of Contract 48 Months


Bridges and Tunnels
Brief Description of Work
APR 2019

HH-07A/HH-30
CONSTRUCTION: MISCELLANEOUS STRUCTURAL REHABILITATION AND OVERCOAT PAINTING AT THE HENRY HUDSON BRIDGE
$10M - $50M

Under this Construction contract, the contractor will perform steel repairs and full overcoat painting of the Henry Hudson Bridge. Additionallly, full shielding for repair work and painting is required on the underside of the upper level roadway, lower level and main arch.

Duration of Contract 27 Months


Bridges and Tunnels
Brief Description of Work
MAY 2019

RK-19/RK-70 Phase 1A
CONSTRUCTION: STRUCTURAL REHABILITATION AT THE ROBERT F. KENNEDY BRIDGE
OVER $50M

Under this Construction contract, the contractor will perform structural rehabilitation and associated painting at the Queens Approach, Queens Viaduct, Wards Island Viaduct, Bronx Truss Span, Bronx Approach, and Harlem River Lift Span at the Robert F. Kennedy Bridge.

Duration of Contract 30 Months


VN-86
SPECIAL SERVICES: DESIGN FOR THE WIDENING OF THE BELT PARKWAY RAMPS AT THE VERRAZANO-NARROWS BRIDGE
$1M - $5M

Under this Design contract, the consultant will produce a design for improvements at the merge of the Verrazano-Narrows Bridge off bound ramps to the Eastbound Belt Parkway, as well as for the widening of the Belt Parkway in the Eastbound direction from the Verrazano-Narrows Bridge ramps to the Bay Parkway Interchange. In addition, the consultant will secure all necessary permitting, studies, and coordination with the various agencies that will need to approve this project.

Duration of Contract 30 Months


MTA Bus
Brief Description of Work
DEC 2018

C-40260
HVAC- COLLEGE POINT DEPOT
$5M - $10M

The purpose of this project is to replace HVAC units and associated equipment that are beyond their useful life at College Point Depot. The existing HVAC equipment is inadequate and no longer complies with the New York State Energy code. The new HVAC will be designed and constructed with the latest energy efficiency and maintenance features, and will be in compliance with the current New York State Energy code. The heating system that serves the chassis wash areas will be modified, and a BMS system to monitor HVAC system will be installed. This project is FTA funded. Procurement will be done on behalf of MTA Bus by MTA New York City Transit.

Duration of Contract 29 Months


C-40261
HVAC- SPRING CREEK DEPOT
$1M - $5M

The purpose of this project is to replace HVAC units and associated equipment that are beyond their useful life at Spring Creek Depot. The existing HVAC equipment is inadequate and no longer complies with the New York State Energy code. The new HVAC will be designed and constructed with the latest energy efficiency and maintenance features, and will be in compliance with the current New York State Energy code. The heating system that serves the chassis wash areas will be modified, and a BMS system to monitor HVAC system will be installed. This project is FTA funded. Procurement will be done on behalf of MTA Bus by MTA New York City Transit.

Duration of Contract 19 Months


MTA Bus
Brief Description of Work
JAN 2019

C-40246
CNG UPGRADE - COLLEGE POINT DEPOT
$5M - $10M

The purpose of this project is to replace CNG units and associated equipment that are beyond their useful life at College Point Depot. The work shall include the replacement of three compressor skids, CNG gas flow priority panel, PLC controls system, components for three dual hose dispensers, various CNG and compressed air piping, hoses, flexible connectors, and valves. Also included is a new three sided enclosure building with roof, overhead crane system, gas leak detection system, camera security system, and lighting. This project is FTA funded. Procurement will be done on behalf of MTA Bus by MTA New York City Transit.

Duration of Contract 20 Months


MTA Bus
Brief Description of Work
FEB 2019

C-40247
CNG UPGRADE - SPRING CREEK DEPOT
$5M - $10M

The purpose of this project is to replace CNG units and associated equipment that are beyond their useful life at Spring Creek Depot. The work shall include the replacement of a natural gas dryer, two compressor skids, CNG gas flow priority panel, PLC controls system, various CNG and compressed air piping, hoses, flexible connectors, and valves. Also included is a new three sided enclosure building with roof, overhead crane system, gas leak detection system, camera security system, and lighting. This project is FTA funded. Procurement will be done on behalf of MTA Bus by MTA New York City Transit.

Duration of Contract 20 Months