Brief Descriptions of Work to be Advertised

** Partially Funded by Federal grant(s)


New York City Transit
Brief Description of Work
SEP 2018

A36164
ADA: 68 ST-HUNTER COLLEGE / LEXINGTON**
OVER $50M

This project will provide full ADA (Americans with Disabilities Act) accessibility at the 68th Street-Hunter College Station located in the borough of Manhattan. Work will include:

Duration of Contract 40 Months


A36991 / A36998 / A37202
PLATFORM EDGES AND COMPONENTS: WHITE PLAINS ROAD, PELHAM AND LENOX
$10M - $50M

The purpose of this project will be to eliminate deficient conditions of various components at four (4) locations in Manhattan and the Bronx. Work will include:

Duration of Contract 14 Months


A37111
ADA: 8 AVENUE SOUTHBOUND ELEVATOR / SEA BEACH
$1M - $5M

This project will install an Americans with Disabilities (ADA) elevator to the southbound platform at 8th Avenue Station on the Sea Beach Line. Work will include:

Duration of Contract 10 Months


A46023
STATION RENEWAL: 138 STREET-GRAND CONCOURSE / JEROME
$10M - $50M

This project will facilitate the renewal of 138th Street-Grand Concourse Station on the Jerome Line. Work may include, but will not be limited to:

Duration of Contract 18 Months


C34869
SANDY MITIGATION: SEWER 207TH STREET**
$10M - $50M

This project will provide flood mitigation by re-locating Department of Environmental Protection (DEP) owned sewers from the 207th Street Yard in Manhattan. Work will include:

Duration of Contract 36 Months


C34931
OVERCOAT PAINTING: 48 STREET - 72 ST / FLUSHING**
$10M - $50M

This project will provide overcoat painting and select steel repairs on the Flushing Line from approximately 48th Street to 72nd Street. Work will include:

Duration of Contract 24 Months


C40516
JAMAICA DEPOT: DEMOLITION AT LOTS #68, #72 [SBMP]
$500K - $1M

This Small Business Mentoring project will demolish the existing building structures on the Merrick Blvd. properties to allow the site to be used as a temporary parking lot prior to the construction of a new Jamaica Bus Depot. Work will include:

Duration of Contract 9 Months


E34029
REPLACE 6 TRACTION ELEVATORS / 8 AVENUE
$10M - $50M

This project will replace six (6) traction elevators at 181 Street and 190th Street Stations on 8th Ave line in Manhattan. Work will include:

Duration of Contract 38 Months


SI02-1895
SIR STAPLETON STATION IMPROVEMENTS
$500K - $1M

This project will improve the entrance at the Intersection of Stapleton Station and Prospect Street in Staten Island. Work will include:

Duration of Contract 6 Months


New York City Transit
Brief Description of Work
OCT 2018

A36949
AQUEDUCT-NORTH CONDUIT AV / RKY
$1M - $5M

This project will repair or replace station components at Aqueduct-North Conduit Avenue Station on the Rockaway Line in Queens. Work will include:

Duration of Contract 10 Months


A37277
STATION LIGHTING: 7 LOCATIONS / VARIOUS (2017) [SBMP TIER2]
$1M - $5M

The purpose of this Small Business Mentoring project is to upgrade station lighting at seven (7) locations in Manhattan and the Brooklyn. Work will include:

Duration of Contract 12 Months


C33941
ROOF REPLACEMENT: TIFFANY CENTRAL WAREHOUSE
$10M - $50M

This project will replace the existing single ply EPDM membrane roofing system at Tiffany Street Store Room. Work will include:

Duration of Contract 24 Months


C40257
EAST NEW YORK DEPOT WINDOWS AND FACADE
$5M - $10M

Window replacement and facade repairs at East New York Bus Depot. Work will include:

Duration of Contract 18 Months


C40269
ARTIC MODIFICATION: EAST NEW YORK DEPOT**
$5M - $10M

The purpose of this project is to rehabilitate interior depot spaces on the 1st Floor of the East New York Bus Depot in Brooklyn to accommodate operation and parking of new articulated buses. Work will include:

Duration of Contract 18 Months


C40270
MODULAR OFFICE: EAST NEW YORK DEPOT [SBFP]**
$1M - $5M

This project shall provide for the construction of a 4,100 sq.ft., one-story administrative building at the East New York Bus Depot on the 1st floor, inside the Depot on the Jamaica Avenue side.

Duration of Contract 16 Months


C40273
NEW ROOF AT QUEENS VILLAGE DEPOT**
$5M - $10M

The purpose of this project is the removal of existing roofing systems and replacement with new EPDM system. Work will include:

Duration of Contract 17 Months


C48719
LINE STRUCTURE COMPONENT REPAIR PROGRAM: STATION AND TUNNEL PRIORITY DEFECT REPAIRS, 1-8 AV/CNR**
$10M - $50M

This project will repair line structure components on the Canarsie Line from 1st Avenue to 8th Avenue Stations in Manhattan. Work will include:

Duration of Contract 21 Months


P36703
SUBSTATION ROOF & ENCLOSURE: WASHINGTON HTS / 8 AV [SBMP2]**
$1M - $5M

This Small Business Mentoring project will rehabilitate the roof and enclosure at the Washington Heights Substation in Manhattan. Work will include:

Duration of Contract 20 Months


SI10-1831
SIR STATION COMPONENT PROGRAM [SBDP]
$1M - $5M

This Small Business Federal Program project will repair select identified structural and architectural defects within the station limits along Staten lsland Railway. Work may include:

Duration of Contract Months


New York City Transit
Brief Description of Work
NOV 2018

C34845
DCE SHOP COMPONENTS, PH 1:180 ST, CONEY ISLAND, PELHAM
$10M - $50M

This project will rehabilitate high-priority deficient components of various shops at the 180th St. Maintenance Facility, Coney Island Complex and Pelham Maintenance and Diesel Facilities. Work varies depending on the individual needs at each location. This project enables immediate rehabilitation or replacement needs to be met as opposed to waiting for a full shop rehabilitation or reconstruction. Work will include:

Duration of Contract 28 Months


C40272
PAVING: MANHATTANVILLE DEPOT (RAMPS & KEENE)
$5M - $10M

This project will provide for the re-paving of the existing concrete ramps at the Manhattanville Bus Depot. In addition, the scope includes the overhaul of 3 AFC Keene machines.

Duration of Contract 8 Months


SF16-1655
PAINT BOOTH: YUKON DEPOT [SBMP TIER2]
$1M - $5M

This Small Business Mentoring project shall provide all labor, tools, equipment necessary for installing, testing and putting into operation a new paint booth. Work will include:

Duration of Contract 8 Months


New York City Transit
Brief Description of Work
DEC 2018

B62041
SANDY MITIGATION: ZEREGA CENTRAL MAINTENANCE FACILITY**
$5M - $10M

This project will provide flood protection to the Zerega Central Maintenance Facility in the Bronx. Work will include:

Duration of Contract 17 Months


C40515
NEW BUS PARKING AT TULLY SITE
$10M - $50M

This project will convert a portion of two (2) lots into an interim bus parking lot near the Casey Stengel Bus Depot in Queens. Work will include:

Duration of Contract 11 Months


E34033 / E34025
REPLACE 3 HYDRAULIC ELEVATORS: GRAND CENTRAL - 42ND ST / FLUSHING & LEXINGTON LINES**
$10M - $50M

This project will replace three (3) hydraulic elevators at Grand Central - 42nd Street Station on the Flushing Line and the Lexington Avenue Line. Work will include:

Duration of Contract 33 Months


P36483
RECONSTRUCTION OF CBH # 392 - FLUSHING RIVER BRIDGE**
$5M - $10M

This project will reconstruct circuit breaker house #392 on the Flushing Line to boost needed voltage for better movement of trains. Work will include:

Duration of Contract 24 Months


R34253
PURCHASE OF 12 3-TON CRANE CARS
$10M - $50M

This project will provide for the design, purchase, acceptance and warranty of twelve (12) 3-Ton Crane Cars.

Duration of Contract 30 Months


New York City Transit
Brief Description of Work
JAN 2019

A37217
PLATFORM COMPONENTS: 10 LOCATIONS / BROADWAY-7TH AVENUE
$10M - $50M

This project will eliminate deficient platform components rated 4.0 or worse, as rated by the "Stations Condition Survey" and existing field conditions, at 10 locations on the Broadway Line. Work will include:

Duration of Contract 22 Months


A37250
SIR STATION COMPONENT PROGRAM
$5M - $10M

This project will repair select, identified structural and architectural defects within the station limits along Staten Island Railway. Work will include:

Duration of Contract 36 Months


A37301
STATION LIGHTING: 8 LOCATIONS / VARIOUS (2018)**
$5M - $10M

This project will improve lighting levels and utilize state of the art fixtures at 8 locations. Work will include:

Duration of Contract 12 Months


A37302
STATION LIGHTING: 3 LOCATIONS / 8AV, WPR (2019) [SBMP TIER2]**
$1M - $5M

This Small Business Mentoring project will improve lighting levels and utilize state of the art fixtures at 3 Stations on the White Plains Road and 8th Avenue Lines. Work will include:

Duration of Contract 12 Months


C34841
DCE SHOP COMPONENTS, PHASE 4: 207 ST, ADMIN
$10M - $50M

This project provides for components repairs to the inside of the 207th Street Administration Building in Manhattan. Work will include:

Duration of Contract 23 Months


C40237
ROOF REHABILITATION: FRESH POND DEPOT
$10M - $50M

This project will provide for the replacement of the existing roof and roof decking area at the Fresh Pond Bus Depot. Work will include:

Duration of Contract 19 Months


C48704
LINE STRUCTURE COMPONENT REPAIR PROGRAM: THE BRONX (BXC)**
$10M - $50M

This project will repair high-priority defects in structural steel and concrete in several sections of the Concourse Line tunnel. Work will include:

Duration of Contract 49 Months


C48714
VENTS BETWEEN STATIONS: E 161 ST - E 192 ST / CONCOURSE
$5M - $10M

The purpose of this project is to bring the vents and drip plans along the E 161 St - E 192 St segment of the Concourse Line in the Bronx to a state of good repair. Work will include:

Duration of Contract Months


C48720
VENTS BETWEEN STATIONS / E 192 ST-E 198 ST /BXC [SBMP TIER2]
$1M - $5M

This Small Business Mentoring project will replace deteriorated sidewalk vent gratings, frames and the underside of the vent structures between E 192 St-E 198 S on the Grand Concourse Line. Work will include:

Duration of Contract Months


C48721
VENTS BETWEEN STATIONS: E 198 ST-E 205 ST / BXC [SBMP TIER2]
$1M - $5M

This Small Business Mentoring project will replace deteriorated sidewalk vent gratings, frames and the underside of the vent structures between E 198 St-E 205 St on the Grand Concourse Line. Work will include:

Duration of Contract Months


E31685
SANDY MITIGATION: 14 FAN PLANTS, LT - 1 LOC, FP 7204**
$10M - $50M

This project will provide long term coastal storm flood protection for the 50th Avenue Fan Plant in Queens. Work will include:

Duration of Contract 18 Months


P36317
NEW SUBSTATION: 28 STREET / 8TH AVENUE**
$10M - $50M

This project will construct a new power substation in the vicinity of 34th Street/8th Avenue to serve the IND, 8th Avenue Line. Work will include:

Duration of Contract 39 Months


P36708
NEW SUBSTATION: CANAL STREET / 8TH AVENUE**
$10M - $50M

This project will construct a new power substation in the vicinity of Canal Street/8th Avenue to serve the IND, 8th Avenue Line. Work will include:

Duration of Contract 39 Months


ST21-3348
MEZZANINE COLUMNS: ATLANTIC AVENUE / CANARSIE [SBMP TIER2]
$1M - $5M

This Small Business Mentoring project will repair mezzanine hangers, walls, and ceilings at Atlantic Ave Station on the Canarsie Line in Brooklyn.

Duration of Contract Months


ST21-3351
MEZZANINE COMPONENTS: NEVINS STREET / EPK [SBMP]
$1M - $5M

This Small Business Mentoring project will eliminate deficient mezzanine components rated 4.0 or worse, as rated by the "Stations Condition Survey" and existing field conditions, at Nevins Street Station on the Eastern Parkway Line.

Duration of Contract Months


New York City Transit
Brief Description of Work
FEB 2019

A36988
PLATFORM COMPONENTS: 2 LOCATIONS / JEROME
$5M - $10M

This project will repair platforms at 2 Jerome Line Stations in the Bronx. Work will include:

Duration of Contract 16 Months


A37307
SUBWAY INTERIOR STAIRS: 2 LOCATIONS / 8AV, BW7 [SBMP]
$5M - $10M

This Small Business Mentoring project will replace interior stairs at two locations on the Broadway-7th Avenue and 8th Avenue Lines. Work will include:

Duration of Contract Months


A37671
SANDY MITIGATION: 138 ST - GR CONCOURSE/JER (VENT BATTERY A)**
$1M - $5M

Rehabilitation of southern vents at 138th Street Station on the Jerome Line. In addition, Mechanical Closure Devices will be provided as part of flood mitigation. Work will include:

Duration of Contract Months


C34928
REHAB EMERGENCY EXITS - VARIOUS LOCS (3RD PARTY)**
$1M - $5M

This project will rehabilitate two emergency exits on the Lexington Line in Manhattan. Work will include:

Duration of Contract 24 Months


E31384
REPLACE 2 BUS WASHERS: JACKIE GLEASON DEPOT [SBMP TIER2]
$1M - $5M

This Small Business Mentoring project will replace two (2) existing washers at Jackie Gleason Depot in Brooklyn. Work will include:

Duration of Contract 12 Months


E34028
REPLACE 8 TRACTION ELEVATORS / VARIOUS
$10M - $50M

This project will replace eight (8) traction elevators at various locations in Brooklyn and Manhattan. Work will include:

Duration of Contract 38 Months


New York City Transit
Brief Description of Work
MAR 2019

A36986
PLATFORM COMPONENTS: 4 LOCATIONS / QUEENS BOULEVARD, ARCHER
$10M - $50M

Duration of Contract 17 Months


A37300
STATION LIGHTING: 5 LOCATIONS / VARIOUS (2015) [SBMP TIER2]**
$1M - $5M

Duration of Contract 12 Months


A46026
STATION RENEWAL: 111 STREET / FLUSHING
$10M - $50M

Duration of Contract 23 Months


A46027
STATION RENEWAL: 103 ST-CORONA PLAZA / FLUSHING
$10M - $50M

Duration of Contract 23 Months


A46028
STATION RENEWAL: 82 STREET-JACKSON HEIGHTS / FLUSHING
$10M - $50M

Duration of Contract 23 Months


A46029
STATION RENEWAL: 69 STREET / FLUSHING
$10M - $50M

Duration of Contract 20 Months


A46030
STATION RENEWAL: 61 STREET-WOODSIDE / FLUSHING
$10M - $50M

Duration of Contract 20 Months


A46031
STATION RENEWAL: 52 STREET / FLUSHING
$10M - $50M

Duration of Contract 20 Months


E34026
REPLACE 11 HYDRAULIC ELEVATORS / VARIOUS**
$10M - $50M

This project will replace 11 hydraulic elevators at various stations in Manhattan, Brooklyn and Queens. Work will include:

Duration of Contract 30 Months


E34030
REPLACE 2 HYDRAULIC ELEVATORS AT BORO HALL / CLARK STREET**
$5M - $10M

Duration of Contract 27 Months


E34031
REPLACE 2 HYDRAULIC ELEVATORS: FRANKLIN AVENUE / SHUTTLE**
$5M - $10M

Duration of Contract 27 Months


S33933
CODE CABLE REPLACEMENT / BW7**
$5M - $10M

Duration of Contract 34 Months


New York City Transit
Brief Description of Work
APR 2019

A37308
SUBWAY INTERIOR STAIRS: WEST 4TH STREET / 8AV [SBMP]
$1M - $5M

Duration of Contract 9 Months


A46024
WATER REMEDIATION: BOROUGH HALL / LEXINGTON
$10M - $50M

Duration of Contract 10 Months


C34846
DCE SHOP COMPONENTS - PHASE 3 / JEROME
$1M - $5M

Duration of Contract 10 Months


New York City Transit
Brief Description of Work
MAY 2019

A37131
ADA: 149 STREET - GRAND CONCOURSE COMPLEX**
$10M - $50M

Duration of Contract Months


C48703
LINE STRUCTURE COMPONENT REPAIR PROGRAM: BROOKLYN (EPK)**
$10M - $50M

Duration of Contract 26 Months


E30465
REPLACE 2 ESCALATORS / PELHAM PARKWAY/ WHITE PLAINS ROAD**
$5M - $10M

Duration of Contract 45 Months


E30512
REPLACE 6 ESCALATORS / VARIOUS**
$10M - $50M

Duration of Contract 48 Months


P36705
CENTRAL SUBSTATION RENEWAL INCLUDING NEW RECTIFIER / 6AV**
$10M - $50M

Duration of Contract 31 Months


P36706
RECONSTRUCT 6 NEGATIVE MANHOLES - CENTRAL SUBSTATION / 6AV
$500K - $1M

Duration of Contract 36 Months


New York City Transit
Brief Description of Work
JUN 2019

C32452
NEW 84C CONTACT RAIL ON LEXINGTON AVE LINE
OVER $50M

Duration of Contract Months


C34866
UPGRADE SCADA SYSTEM (BMT)**
$10M - $50M

Duration of Contract 29 Months


C34867
SANDY MITIGATION: BACK-UP POWER CONTROL CENTER (PCC)**
$5M - $10M

Duration of Contract 29 Months


C40952
FIRE ALARM SYSTEMS: 15 DOS LOCATIONS
$10M - $50M

Duration of Contract 34 Months


C43764
MONEY ROOM: SECURITY SYSTEMS UPGRADE [SBMP TIER2]
$1M - $5M

Duration of Contract 7 Months


C48730
REPAIRING 'A' AND PRIORITY 'B' COLUMN BASE CONDITIONS / WPR
$10M - $50M

Duration of Contract 24 Months


E30436
REPLACE 7 ESCALATORS / VARIOUS (BRONX & MANHATTAN)**
$10M - $50M

Duration of Contract 36 Months


P36341
SANDY RESILIENCY: SITE IMPROVEMENTS AT 2 LOCATIONS (SBFP)**
$1M - $5M

Duration of Contract 8 Months


P36489
NEW NEGATIVE SIDE FEEDERS ON LEXINGTON AVE LINE
OVER $50M

Duration of Contract Months


S33931
LIFE CYCLE REPLACEMENT OF SPEED ENFORCEMENT SYSTEMS**
$10M - $50M

Duration of Contract 48 Months


S33932
LIFE CYCLE REPLACEMENT OF CODE SYSTEMS - PHASE 1**
$10M - $50M

Duration of Contract 36 Months


New York City Transit
Brief Description of Work
JUL 2019

B40666
275 HYBRID-ELECTRIC STANDARD BUSES
OVER $50M

Duration of Contract 21 Months


CM03-2302
LIVONIA MAINTENANCE FACILITY REHAB: PHASE 1 [SBDP]
$5M - $10M

Duration of Contract 12 Months


E31713
REHAB FAN PLANT DAMPER SYSTEM - VARIOUS LOCATIONS**
$10M - $50M

Duration of Contract 36 Months


New York City Transit
Brief Description of Work
AUG 2019

C34925
OVERCOAT: MYRTLE AVENUE - DESALES PLACE / JAMAICA**
$10M - $50M

Duration of Contract 33 Months


C43051
COMM ROOM UPGRADE AND EXPANSION [SBDP]
$10M - $50M

Duration of Contract Months


Long Island Rail Road
Brief Description of Work
SEP 2018

L11118
N. MAIN AND ACCABONAC BRIDGE REPLACEMENTS**
$1M - $5M

The contract requires the installation of a total of nine (9) 72' drilled shafts with 75' embedment at two bridges in East Hampton, NY: four (4) 72' diameter drilled shaft at North Main Street Bridge; four (4) 72' diameter drilled shaft at Accabonac Road Bridge; and one (1) 72' diameter trial drilled shaft.

Duration of Contract 5 Months


Long Island Rail Road
Brief Description of Work
FEB 2019

L11143
SUBSTATION COMPONENTS
$5M - $10M

This contract is for replacing Motor Generators equipment at Hillside and Babylon Yard that are beyond its useful life and either deteriorated and/or in marginal operating condition in order to address current and future signal system requirements

Duration of Contract 18 Months


Long Island Rail Road
Brief Description of Work
MAR 2019

E04979
LONG ISLAND CITY YARD RESILIENCY **
$10M - $50M

Duration of Contract 24 Months


Long Island Rail Road
Brief Description of Work
APR 2019

L11409
WRECK LEAD BRIDGE MECHANICAL REHABILITATION
$250K - $500K

Duration of Contract 16 Months


Long Island Rail Road
Brief Description of Work
MAY 2019

L11626
SUBSTATION REPLACEMENTS**
$10M - $50M

Duration of Contract 29 Months


Long Island Rail Road
Brief Description of Work
JUN 2019

L11723
MOYNIHAN TRAIN HALL
$1M - $5M

Duration of Contract 6 Months


Long Island Rail Road
Brief Description of Work
JUL 2019

L10350
PENN STATION SUBSTATION REPLACEMENT
$10M - $50M

Duration of Contract 24 Months


Metro-North Railroad
Brief Description of Work
SEP 2018

M10398
REHABILITATION OF HARLEM LINE BRIDGES HA 61.06 AND HA 61.36, PATTERSON, NY**
$5M - $10M

This contract provides for the replacement of two existing railroad bridges crossing over Croton River at Metro-North Railroad's Harlem Line Milepost 61.06 and 61.36 in Patterson, Dutchess County, New York.

Duration of Contract 24 Months


M10469
PBX SOFTWARE/HARDWARE
$1M - $5M

This contract will provide UPS (Uninterruptible Power Supply) and power distribution hardware associated with PBX (Private Branch Exchange) equipment at five (5) Metro-North Railroad locations (i.e. South East, North White Plains, Mott Haven, Croton Harmon and Poughkeepsie). Also, it will provide the Interface UPS to centralized reporting system, software upgrade for PBX Signaling Server and expansion hardware for additional users at the PBX to existing system.

Duration of Contract 12 Months


M10991
CONSTRUCTION OF NODE HOUSE ROOFS
$500K - $1M

This contract is for the survey of 36 locations for a 10' x 20' communication bungalow and furnishes, deliver and install new roofing system as needed. Metro North Railroad has 36 locations spread out on all three lines (Harlem, Hudson and New Haven) that have communication bungalows that require an assessment for the replacement of their roofs. The work includes survey and assessment of the current communication houses roof condition (includes water proofing membrane). Based on the determination of the findings the existing roofs must be replaced, as needed, with new roofing systems. The work must be performed in a matter that is non disruptive to railroad operations and free of damage to equipment within the space.

Duration of Contract 14 Months


M11122
HARLEM RIVER LIFT BRIDGE WATERSIDE PROTECTION**
$5M - $10M

This contract provides for Waterside Protection of Metro-North Railroad's Harlem River Lift Bridge. It includes the demolition of the existing Bronx fender, walkways and pile clusters. Installation of new composite lumber fendering supported on thirty 24" driven piles and four 72" drilled shafts at both the Manhattan and Bronx piers. Installation of floating barrier protective system.

Duration of Contract 18 Months


M11467
CONSTRUCT FENCING & ACCESS CONTROL
$1M - $5M

This contract provides for the construction of fencing to deter and prevent unauthorized access while providing access control to MNR personnel.

Duration of Contract 12 Months


Metro-North Railroad
Brief Description of Work
OCT 2018

M11505
MOTOR CARS WITH TOOL CIRCUITS**
$500K - $1M

This contract will provide for the purchase of four (4) Motor Cars with Tool Circuits for Metro-North Railroad's Maintenance of Way machine shop. Specifications and modifications include additional tool storage, perimeter lighting and tool circuits with retractable reels.

Duration of Contract 12 Months


M11506
DYNAMIC TRACK STABILIZER**
$1M - $5M

This contract will provide for the purchase of one (1) Dynamic Track Stabilizer for Metro-North Railroad's Maintenance of Way Track and Structures Department. Specifications and modifications include modified travel cab, hose holders, reflective tape and third rail clearance.

Duration of Contract 12 Months


M11507
RAIL LIFTER**
$250K - $500K

This contract will provide for the purchase of two (2) Rail Lifters for Metro-North Railroad's Maintenance of Way machine shop. Specifications and modifications include third rail clearance, LED Lighting and perimeter lighting.

Duration of Contract 12 Months


M11508
AIR COMPRESSOR (TOW BEHIND)**
$100K - $250K

This contract will provide for the purchase of six (6) Air Compressors (tow behind) for Metro-North Railroad's Maintenance of Way machine shop.

Duration of Contract 12 Months


M11509
BALLAST REGULATOR**
$1M - $5M

This contract will provide for the purchase of seven (7) Ballast Regulators for Metro-North Railroad's Maintenance of Way machine shop. Specifications and modifications include perimeter lighting, dust control system, third rail clearance, LED lighting and reflective tape.

Duration of Contract 12 Months


M11510
SPEED SWING**
$500K - $1M

This contract will provide for the purchase of two (2) Speed Swings for Metro-North Railroad's Maintenance of Way machine shop. Specifications and modifications include third rail clearance, high rail equipment, train coupler and air system and reflective tape.

Duration of Contract 12 Months


M11511
ALL TERRAIN HI-REACH FORKLIFT**
$100K - $250K

This contract will provide for the purchase of one (1) All Terrain Hi-Reach Forklift for Metro-North Railroad's Maintenance of Way machine shop. Specifications and modifications include enclosed cab with HVAC equipment.

Duration of Contract 12 Months


M11512
UTILITY TASK VEHICLE (UTV) (4WD W/PLOW AND SANDER)**
$50 - $100K

This contract will provide for the purchase of two (2) Utility Task Vehicle (UTV) (4WD w/plow and sander) for Metro-North Railroad's Maintenance of Way machine shop. Specifications and modifications include plow and sander, coated dump body, rust protection and HVAC equipment.

Duration of Contract 12 Months


M11513
ROUGH TERRAIN ARTICULATING BOOM LIFT**
$100K - $250K

This contract will provide for the purchase of one (1) Rough Terrain Articulating Boom Lift for Metro-North Railroad's Maintenance of Way machine shop.

Duration of Contract 12 Months


M11514
HYDRAULIC METAL SHEAR (NWP SHOP)**
$50K - $100K

This contract will provide for the purchase of one (1) Hydraulic Metal Shear for Metro-North Railroad's Maintenance of Way machine shop.

Duration of Contract 12 Months


M11515
HYDRAULIC METAL BRAKE (NWP SHOP)**
$50K - $100K

This contract will provide for the purchase of one (1) Hydraulic Metal Brake for Metro-North Railroad's Maintenance of Way machine shop.

Duration of Contract 12 Months


M11516
PROGRAMMABLE METAL CUTTING TABLE (NWP SHOP)**
$50K - $100K

This contract will provide for the purchase of one (1) Programmable Metal Cutting Table for Metro-North Railroad's Maintenance of Way machine shop.

Duration of Contract 12 Months


M11517
RAIL HEATER**
$500K - $1M

This contract will provide for the purchase of one (1) Rail Heater for Metro-North Railroad's Maintenance of Way machine shop. Specifications and modifications include enclosed cab with HVAC equipment, perimeter lighting and reflective tape.

Duration of Contract 12 Months


M11518
WHEEL LOADER**
$100K - $250K

This contract will provide for the purchase of one (1) Wheel Loader for Metro-North Railroad's Maintenance of Way machine shop. Specifications and modifications include 4 in one bucket, side dump, hydraulic quick connects for bucket change out, forks and snow pusher.

Duration of Contract 12 Months


Metro-North Railroad
Brief Description of Work
DEC 2018

M10667/M10769
REPAIRS FOR LOCALIZED DEFICIENCIES IN GCT TRAIN SHED AND EAST SPINE VESTIBULE**
$10M - $50M

This contract is part of the cyclical program to rehabilitate the Grand Central Terminal Train Shed. It will provide for priority repairs to steel, structural framing, concrete deck and expansion joints to correct localized deficiencies. The contractor will work from roadway level (Park Avenue and crossing Streets over the GCT train shed) to make repairs below grade and will also work from upper track level on overhead repairs during night and off peak hours. At 48th Street and Park Avenue the contractor will perform structural repairs and modifications to architectural finishes above the East Spine Vestibule, immediately east of Park Avenue.

Duration of Contract 24 Months


M10717
HARLEM & NEW HAVEN LINE STATION PRIORITY REPAIRS**
$10M - $50M

This contract is for construction of priority structural repairs at the following stations on Metro-North Railroad's Harlem and New Haven Lines: (Harlem Line) - Southeast, Brewster, Croton Falls, Purdy's, Goldens Bridge, Katonah, Bedford Hills, Mount Kisco, Chappaqua, Pleasantville, Hawthorne, Mt Pleasant, Valhalla, North White Plains, White Plains, Hartsdale, Scarsdale and Crestwood. (New Haven Line) - Larchmont and Rye. The objective of these structural priority repairs is to address deteriorating elements of the stations platforms and repair other severely deteriorated elements of these stations and to extend the useful life of these station platforms.

Duration of Contract 33 Months


M10964/M10433
BRIDGE NH25.74 OVER WILLET AVENUE, BRIDGE NH 25.83 OVER HIGHLAND STREET/RETAINING WALL NH25.3 PORT CHESTER NY
$10M - $50M

This contract provides for the replacement of the two railroad bridges and a reconstruction of a retaining wall. The two bridges are existing four (4) track steel railroad bridges over Willet Avenue and over Highland Street on Metro-North Railroad's New Haven line at Milepost NH 25.74 and NH 25.83 in Port Chester, West Chester County, New York. The Contractor will work on both bridges simultaneously and rebuild one track at a time using Accelerated Construction Methods. Work will include a full steel superstructure replacement, soil anchors and partial concrete substructure rehabilitation. This contract will also include the replacement of the existing retaining wall in Port Chester adjacent to 149 South Main Street (NH Milepost 25.3)

Duration of Contract 24 Months


Metro-North Railroad
Brief Description of Work
MAR 2019

M10849
CONSTRUCTION T35 & WALDORF ELEVATORS
$1M - $5M

This contract is to replace two freight elevators - the Waldorf Elevator and the T-35 Elevator – which have reached the end of their useful lives. The elevators will be replaced to meet current applicable codes and requirements, including the replacement of the controllers, drive units, car enclosures and doors as well as addition of automatic recall and emergency telephone and communications. Also, the T-35 shaft will be extended down to the upper level landing of the Oyster Bar ramp in Grand Central Terminal.

Duration of Contract 17 Months


Metro-North Railroad
Brief Description of Work
JUL 2019

M10472
CONSTRUCTION-MOTT HAVEN - MOTOR ALTERNATORS**
$5M - $10M

This contract provides for the construction of the replacement of two motor alternator sets 100 Hz. are located in Mott Haven Yard. The signal substation motor alternator sets convert high voltage 60 HZ AC power to medium voltage AC power to serve as a primary feed for Metro-North North's Signal systems. Mott Haven Yard is one of (6) locations serving the electrified territory of the Harlem and Hudson lines.

Duration of Contract 28 Months


Metro-North Railroad
Brief Description of Work
AUG 2019

M10637/M11396
CONSTRUCTION- 6TH AVE AND 10TH AVE - MOUNT VERNON NY**
$15M - $20M

This contract will provide for the superstructure replacement and substructure rehabilitation of the 6th Avenue and 10th Avenue bridge over Metro-North Railroad in the City of Mount Vernon. The Bridge will continue to be closed to vehicular traffic for a ten month period during construction. The construction contract includes the replacement of the existing timber deck vehicular bridge with a new redundant multi-stringer bridge supporting a concrete deck.

Duration of Contract 29 Months


Bridges and Tunnels
Brief Description of Work
SEP 2018

BW-07/BW-32
DESIGN BUILD: FENDER PROTECTION AT TOWER PIERS AND INSTALLATION OF FIRE STANDPIPE CONNECTORS AT THE BRONX WHITESTONE BRIDGE
$10M - $50M

Under this Design-Build contract, the design-builder will design and construct fender protection at the tower piers and install fire standpipe connectors at the Bronx Whitestone Bridge.

Duration of Contract 42 Months


HC-80/QM-36
SPECIAL SERVICES: REHABILITATION OF VENTILATION & SERVICE BUILDINGS AT THE HUGH CAREY AND QUEENS MIDTOWN TUNNELS
$1M - $5M

Under this Design Services contract, the designer will develop a Master Plan for the Hugh L. Carey and Queens Midtown Tunnels Buildings (Ventilation, Service and Emergency Garage), perform a feasibility study, and design the selected recommendations.

Duration of Contract 30 Months


Bridges and Tunnels
Brief Description of Work
OCT 2018

VN-11
CONSTRUCTION MANAGEMENT: BROOKLYN/GOWANUS APPROACH RECONSTRUCTION
$1M - $5M

Under this Construction Management contract, the consultant will provide construction administration, inspection, and associated services for the widening of the Gowanus Expressway from 92nd street to Fort Hamilton Parkway.

Duration of Contract 42 Months


VN-84
CONSTRUCTION MANAGEMENT: RECONSTRUCTION OF THE VERRAZANO-NARROWS BRIDGE APPROACH RAMPS
$10M - $50M

Under this Construction Management contract, the consultant will provide construction administration work for the reconstruction of a portion of the Verrazano-Narrows Bridge upper level approach ramps.

Duration of Contract 50 Months


Bridges and Tunnels
Brief Description of Work
NOV 2018

RK-23C
DESIGN-BUILD: CONSTRUCTION OF NEW HARLEM RIVER DRIVE CONNECTOR RAMP
OVER $50M

Under this Design-Build contract, the design-builder will construct a new connector ramp from the Harlem River Lift Span to the north bound Harlem River Drive. Seven of the necessary footings have been constructed under a separate NYCDOT contract and shall be utilized for the new ramp.

Duration of Contract 30 Months


RK-66
DESIGN-BUILD: ENHANCEMENT OF ELECTRIC POWER RESILIENCY AT THE ROBERT F. KENNEDY BRIDGE
$10M - $50M

Under this Design-Build contract, the design-builder will design and construct a secondary feeder with an Automatic Transfer Switch at the power sources of the tolling infrastructure at the Robert F. Kennedy Bridge, and relocate the Robert Moses Building boilers and electric substation outside the building footprint to a location above the design flood level.

Duration of Contract 24 Months


Bridges and Tunnels
Brief Description of Work
DEC 2018

TN-53
CONSTRUCTION MANAGEMENT FOR APPROACH VIADUCT STRUCTURAL REHABILITATION AT THE THROGS NECK BRIDGE
$10M - $50M

Under this Construction Management contract, the consultant will provide construction administration, inspection, and associated services for the seismic retrofit and structural rehabilitation of the appoach viaducts at the Throgs Neck Bridge.

Duration of Contract 52 Months


TN-87
SPECIAL SERVICES: DESIGN FOR THE ANCHORAGE AND TOWER PROTECTION AT THE THROGS NECK BRIDGE
$1M - $5M

Under this Design contract, the consultant will produce a design for the upgrade/replacement of the Anchorage and Tower protection at the Throgs Neck Bridge. In addition, the consultant will secure all necessary permits and perform all necessary coordination with the applicable permitting agencies that will need to approve this project.

Duration of Contract 48 Months


Bridges and Tunnels
Brief Description of Work
JAN 2019

RK-20
CONSTRUCTION: MAIN CABLE INSPECTION AND REHABILITATION AT THE ROBERT F. KENNEDY BRIDGE
$5M - $10M

Under this Construction contract, the contractor will unwrap and wedge open main cables at selected panels for in-depth inspection, perform cable wire sampling and repairs, re-compact and re-wrap the main cables, and painting of the wrapping wires, as well as associated main cable band bolts tension measurements and re-tensioning at the Robert F. Kennedy Bridge.

Duration of Contract 18 Months


RK-20 & RK-19/RK-70 Phase 1A
CONSTRUCTION MANAGEMENT FOR MAIN CABLE INVESTIGATION AND STRUCTURAL REHABILITATION AT THE ROBERT F. KENNEDY BRIDGE
$5M - $10M

Under this Construction Management contract, the consultant will provide Construction Administration and Inspection Services for RK-20 Main Cables Investigation and RK-19/RK-70 Phase 1A Construction Contract for the structural rehabilitation and associated painting at the Queens Approach, Queens Viaduct, Wards Island Viaduct, Bronx Truss Span, Bronx Approach, and Harlem River Lift Span at the Robert F. Kennedy Bridge.

Duration of Contract 42 Months


RK-23C
CONSTRUCTION MANAGEMENT: QUALITY ASSURANCE AND CM SERVICES FOR THE NEW HARLEM RIVER DRIVE CONNECTOR RAMP
$5M - $10M

Under this Construction Management contract, the consultant will provide Quality Oversight Inspection and Construction Management Services for RK-23C Design-Build contract, which includes installing a new connector ramp between the Harlem River Lift Span (HRLS) of the Robert F. Kennedy Bridge and north bound Harlem River Drive (HRD).

Duration of Contract 36 Months


VN-11
CONSTRUCTION: BROOKLYN/GOWANUS APPROACH RECONSTRUCTION
$10M - $50M

Under this Construction contract, the contractor will perform widening of the Gowanus Expressway from 92nd Street to Fort Hamilton Parkway.

Duration of Contract 42 Months


VN-84
CONSTRUCTION: RECONSTRUCTION OF THE VERRAZANO-NARROWS BRIDGE APPROACH RAMPS
OVER $50M

Under this construction contract, the contractor will reconstruct a portion of the Verrazano-Narrows Bridge upper level approach ramps.

Duration of Contract 48 Months


Bridges and Tunnels
Brief Description of Work
FEB 2019

HH-07A/HH-30
CONSTRUCTION MANAGEMENT: MISCELLANEOUS STRUCTURAL REHABILITATION AND OVERCOAT PAINTING AT THE HENRY HUDSON BRIDGE
$1M - $5M

Under this Construction Management contract, the consultant will provide construction administration, inspection, and associated services for HH-07A/HH-30 Construction project.

Duration of Contract 36 Months


Bridges and Tunnels
Brief Description of Work
MAR 2019

RK-66
CONSTRUCTION MANAGEMENT: QUALITY OVERSIGHT INSPECTION AND CONSTRUCTION MANAGEMENT SERVICES TO ENHANCE ELECTRIC POWER RESILIENCY AT THE ROBERT F. KENNEDY BRIDGE
$1M - $5M

Under this Construction Management contract, the consultant will provide Quality Oversight Inspection and Construction Management Services for the RK-66 Design-Build project, which will provide a secondary feeder with an Automatic Transfer Switch at the power sources of the tolling infrastructure at the Robert F. Kennedy Bridge & relocate the Robert Moses Building boilers and electric substation outside the building footprint to a location above the design flood level.

Duration of Contract 36 Months


TN-53
CONSTRUCTION: APPROACH VIADUCT STRUCTURAL REHABILITATION AT THE THROGS NECK BRIDGE
OVER $50M

Under this Construction contract, the contractor will perform seismic retrofits and structural upgrades and repairs to the approach structures at the Throgs Neck Bridge.

Duration of Contract 45 Months


VN-80
SPECIAL SERVICES: DESIGN FOR THE REHABILIATION OF THE SUSPENDED SPAN LOWER LEVEL DECK AT THE VERRAZANO-NARROWS BRIDGE
$1M - $5M

Under this Design contract, the consultant will produce a design for the rehabilitation of the suspended span lower level deck to extend the life of the deck by approximately 15-20 years.

Duration of Contract 48 Months


VN-86
SPECIAL SERVICES: DESIGN FOR THE WIDENING OF THE BELT PARKWAY RAMPS AT THE VERRAZANO-NARROWS BRIDGE
$1M - $5M

Under this Design contract, the consultant will produce a design for improvements at the merge of the Verrazano-Narrows Bridge off bound ramps to the Eastbound Belt Parkway, as well as for the widening of the Belt Parkway in the Eastbound direction from the Verrazano-Narrows Bridge ramps to the Bay Parkway Interchange. In addition, the consultant will secure all necessary permitting, studies, and coordination with the various agencies that will need to approve this project.

Duration of Contract 30 Months


Bridges and Tunnels
Brief Description of Work
APR 2019

HH-07A/HH-30
CONSTRUCTION: MISCELLANEOUS STRUCTURAL REHABILITATION AND OVERCOAT PAINTING AT THE HENRY HUDSON BRIDGE
$10M - $50M

Under this Construction contract, the contractor will perform live load strengthening and seismic retrofit, repair plate installation, heat straightening of deformed angles, spandrel arch column bracing member replacement, and rivets and bearing replacement at the Henry Hudson Bridge. A full protective shielding will also be installed. Other work tasks include pack rust cleaning, caulking, and overcoat painting.

Duration of Contract 30 Months


Bridges and Tunnels
Brief Description of Work
MAY 2019

RK-19/RK-70 Phase 1A
CONSTRUCTION: STRUCTURAL REHABILITATION AT THE ROBERT F. KENNEDY BRIDGE
OVER $50M

Under this Construction contract, the contractor will perform structural rehabilitation and associated painting at the Queens Approach, Queens Viaduct, Wards Island Viaduct, Bronx Truss Span, Bronx Approach, and Harlem River Lift Span at the Robert F. Kennedy Bridge.

Duration of Contract 30 Months


Bridges and Tunnels
Brief Description of Work
AUG 2019

BW-63/TN-63
CONSTRUCTION: BRONX APPROACH ROADWAY CIVIL IMPROVEMENTS AT THE BRONX WHITESTONE AND THROGS NECK BRIDGE
$10M - $50M

Under this Construction contract, the contractor will reconstruct roadway through the limits of the former Throgs Neck Bridge and Bronx Whitestone Bridge toll plazas. The contractor will also perform work that includes the installation of a permanent concrete median barrier, new drainage systems, new roadway lighting, landscaping improvements, and incidental civil construction work.

Duration of Contract 16 Months


MTA Bus
Brief Description of Work
SEP 2018

C40261
HVAC-SPRING CREEK DEPOT**
$1M - $5M

The purpose of this project is to replace HVAC units and associated equipment that are beyond their useful life at Spring Creek Depot. The existing HVAC equipment is inadequate and no longer complies with the New York State Energy code. The new HVAC will be designed and constructed with the latest energy efficiency and maintenance features, and will be in compliance with the current New York State Energy code. The heating system that serves the chassis wash areas will be modified, and a BMS system to monitor HVAC system will be installed. This project is FTA funded. Procurement will be done on behalf of MTA Bus by MTA New York City Transit.

Duration of Contract 19 Months


MTA Bus
Brief Description of Work
OCT 2018

C40260
HVAC-COLLEGE POINT DEPOT**
$5M - $10M

The purpose of this project is to replace HVAC units and associated equipment that are beyond their useful life at College Point Depot. The existing HVAC equipment is inadequate and no longer complies with the New York State Energy code. The new HVAC will be designed and constructed with the latest energy efficiency and maintenance features, and will be in compliance with the current New York State Energy code. The heating system that serves the chassis wash areas will be modified, and a BMS system to monitor HVAC system will be installed. This project is FTA funded. Procurement will be done on behalf of MTA Bus by MTA New York City Transit.

Duration of Contract 28 Months


MTA Bus
Brief Description of Work
DEC 2018

C40246
CNG UPGRADE-COLLEGE POINT DEPOT**
$5M - $10M

The purpose of this project is to replace CNG units and associated equipment that are beyond their useful life at College Point Depot. The work shall include the replacement of three compressor skids, CNG gas flow priority panel, PLC controls system, components for three dual hose dispensers, various CNG and compressed air piping, hoses, flexible connectors, and valves. Also included is a new three sided enclosure building with roof, overhead crane system, gas leak detection system, camera security system, and lighting. This project is FTA funded. Procurement will be done on behalf of MTA Bus by MTA New York City Transit.

Duration of Contract 20 Months

** Partially Funded by Federal grant(s)